Tariff Rates (GST Exclusive) From 1/01/2008
Port Charges
Wharfage Charge General (per tonne/cubic
metre the greater of) formally shipper charge $0.9753
Ship Charge General (per GRT) $1.2893
Moorings General (per GRT) -
Port Security Charge (per GRT) -
Port Enhancement Charge (PEP) General (per tonne) $2.0440
Shift Ship Charge General (per GRT) $0.1500
Berth Hire General (per hour) $168.4256
Ship Loading Charge Iron Ore (per tonne) $2.9300
Ship Loading Charge General (per tonne) $2.0592
Train Unloading Charge General (per tonne) $0.8280
Ancillary Charges
Berthage - Fishing Vessels (per metre per 24 hour period) $4.2997
Mooring Cancellation / Variation $827.0900
Pilotage Boat Hire Outside Normal Shipping Movements
(per hour) $617.9114
Pilotage Cancellation (per cancellation) $568.4364
Pilotage Detention (per hour) $568.4364
Wharf Clean (Sweeper) (per hour) $148.4762
Wharf Wash (per wash) $44.0640
Weighbridge Hire (per eight hour shift) $189.1735
Stands, Steps (per eight hour shift) $109.4766
Stands, Steps, Race (per eight hour shift) $164.2150
Hopper Wash (per wash) $7.8335
Container Forklift Hire 30 Tonne (per hour) $149.9993
Hyster Forklift Hire 8 Tonne (per hour) $75.0003
Samsung Forklift Hire 2 Tonne (per hour) $27.4993
Compare Compressor (per hour) $21.2098
Dump Truck (per hour) $58.9160
Franna Crane 17 Tonne (per hour) $150.0038
Gangway Brow (per eight hour shift) $164.2150
IR Compressor (per hour) $37.7062
Punt 4 metre (per hour) $23.5664
Water (per kilo litre) $1.9584
Napoli worldport | Italy |
---|---|
Genoa worldport | Italy |
Ashdod worldport | Isreal |
Thessaloniki wor | Greece |
Takoradi worldpo | Ghana |
Tema worldport | Ghana |
Hamburg worldpor | Germany |
Kotka worldport | Finland |
Said worldport | Egypt |
Sokhna worldport | Egypt |
>>More |