Home>>Port Charges>>details

Country : AustraliaAlma Port




MOORING CHARGES                                             All rates listed are GST Inclusive


Handling Moorings (Moor & Unmoor combined)                    2,135.10

(Moorings charge includes Lines Launch Hire)

Handling Moorings  - Shift ship  50% of Standard Charge   1,067.55

Cancellation of Moorings - 50% of Standard Charge           1,067.55


SERVICES AND EQUIPMENT


Safety & Security Watch, Dayman and Roadwatch

Fire pump (Stand-by rate only) per day or part thereof      184.36

Fire Extinguisher 60kg per day or part thereof                   34.43

Hoses , branches and keys per day or part thereof            74.14


GENERAL CHARGES


Port Facilities Hire (per ship, per day or part thereof)      718.63

Gear Room and battery charging facilities (per day)        185.57

Other room hire first day                                                  93.61

Other room hire additional days                                      31.68

Wharf Cleaning                                                                99.00




Port Facilities Hire includes Office, Dining Room and Amenities hire, electricity and cleaning, plus electricity and

cleaning on the wharf.


Gear Room and battery charging facilities includes hire and cleaning of one gear room, battery charger and set up

for battery charging and hire of a power board.


Other Room hire first day includes cleaning.


EQUIPMENT CHARGES


Forklifts

per hour or part thereof           30.03

Gangway

per day or part thereof           28.05

Lighting / Communications

per day or part thereof           73.70




FLOATING PLANT (Other than for shipping requirements)

 

                                                All rates listed are GST Inclusive

 

Launch Col Brown

Upfront fee                                       129.69

Plus per hour or part thereof             59.51

Plus Crew per hour or part thereof

(At relevant hourly chargeout rate)


COLLECTION OF SHIPS REFUSE AND GALLEY WASTE


Service Fee                       2,339.26

Sterilised Drum Fee           80.41


LABOUR CHARGEOUT RATES




Port Employee per hr                           86.24

Superintendent per hr                         103.51

(Penalty rates apply to above rates)




TONNAGE RATES


The tonnage rates for vessels loading / unloading are as follows:-

For the first day or part thereof per GRT            0.28

Minimum Charge                                                 269.83

Subsequent days or part thereof per GRT          0.24

Minimum Charge                                                  269.83

Time at berth shall be taken from first line on to the berth, to last line off the berth.




HARBOUR DUES

A - HARBOUR DUES ON GOODS NOT IN CONTAINERS

 


                                                             All rates listed are GST Inclusive

 Description of Goods                 Import / Export

Ammonium Nitrate - per tonne                         3.30

Explosives - per tonne

Explosives - per cubic metre                             6.60

Charged at whichever is the greater value      6.05

 

Livestock - per head                                         1.38

Meatworks products - per tonne (export only) 2.97

Salt – per tonne                                              1.27

Petroleum Products - per kilolitre                      3.63

Returned empties - per cubic metre                   0.94

All goods not otherwise specified - per tonne    2.97

All goods not otherwise specified - per cubic metre  2.64

Charge at whichever is the Greater Value 

Transhipment Goods - per tonne or per cubic metre 0.46




In the case of goods (not in containers) which are levied at a rate -


a)  per tonne, harbour dues shall be payable at the prescribed rate per tonne of 1000 kilograms of gross mass - ie mass of

goods plus mass of packaging, pallets, drums, bags or any other type of packaging;

b)  per cubic metre, harbour dues shall be payable at the prescribed rate per cubic metre of the volume of the goods of gross volume - ie total volume of goods and packaging, pallets, drums or any other type of packaging;

c)  per tonne and per cubic metre, harbour dues shall be payable in accordance with whichever of subparagraph (a) or

(b) will produce the greater amount of harbour dues.


B - HARBOUR DUES ON GOODS IN CONTAINERS            All rates listed are GST Inclusive

Import /Export Harbour Dues for a Standard Container:-

Ammonium Nitrate                                                                                   71.39

Explosives                                                                                               173.25

All goods not otherwise specified - imports and exports                        73.70

Transhipment of containers -   50% of applicable rate 


Returned empty containers                                                                      34.76


Standard container = 20 foot (TEU) (6.1mtr x 2.5 x 2.5).  Rates for containers greater than 20 foot will

be adjusted on a pro rata basis.  Minimum chargeable unit is a 20 foot container.

Country Codes
AE UnitedArabEmirates
AL Albania
AR Argentina
AU Australia
BD Bangladesh
BG Bulgaria
BI Burundi
BM Bermuda
BO Bolivia
BS Bahamas
>>More